NORTHERN AVIATION ASSOC, THCHIANG MAI AIRSPORT AIRFIELD
AIRCRAFT: QUICKSILVER MX IIENGINE: ROTAX 582 UL

STATUS: DRAFT — PENDING AIRCRAFT-SPECIFIC VERIFICATION

01 — PRE-FLIGHT INSPECTION CHECKLIST

  1. AIRCRAFT DOCUMENTS / AIRWORTHINESSCHECK
  2. TYRES / WHEELS / BRAKESCHECK
  3. ALL STRUTS / ATTACHMENT POINTSCHECK
  4. WING SAILS / STITCHING / TEARSCHECK
  5. CONTROL CABLES / CONNECTIONSCHECK
  6. AILERONS / ELEVATOR / RUDDERFREE & CORRECT
  7. FUEL QUANTITY — BOTH TANKSCHECK
  8. FUEL LINES / FILTERS / LEAKSCHECK
  9. SEATS / SEAT BELTSSECURE
  10. ENGINE / ENGINE MOUNTSCHECK
  11. ENGINE OIL SYSTEM / PREMIXCHECK
  12. ROTARY VALVE OIL RESERVOIRCHECK
  13. COOLANT LEVEL / HOSESCHECK
  14. PROPELLER / PROPELLER MOUNTINGCHECK
  15. EXHAUST SYSTEM / SPRINGSCHECK
  16. TRIM TAB — IF INSTALLEDCHECK
  17. FLIGHT CONTROLSFREE & CLEAR

PRE-FLIGHT INSPECTION COMPLETED

UNCONTROLLED WHEN PRINTED
CREATED: PRINTED:
1 / 6
NORTHERN AVIATION ASSOC, THCHIANG MAI AIRSPORT AIRFIELD
AIRCRAFT: QUICKSILVER MX IIENGINE: ROTAX 582 UL

STATUS: DRAFT — PENDING AIRCRAFT-SPECIFIC VERIFICATION

02 — ENGINE STARTING CHECKLIST

  1. HELMET / HEADSETFASTEN
  2. SEAT BELTFASTEN
  3. TRIM TABSET
  4. MICROPHONE / RADIOCONNECT
  5. HEADSET / INTERCOMON & CHECK
  6. FUEL VALVESSET
  7. MASTER POWERON
  8. FUEL PUMP — IF INSTALLEDAS REQUIRED
  9. ENGINE PRIMING — COLD START ONLYAS REQUIRED
  10. CHOKEAS REQUIRED
  11. THROTTLESTART POSITION
  12. PROPELLER AREACLEAR
  13. IGNITION SWITCHESON
  14. CLEAR PROPANNOUNCE
  15. ENGINESTART
  16. ENGINE INSTRUMENTSCHECK

ENGINE STARTING CHECKLIST COMPLETED

03 — ENGINE WARM-UP CHECKLIST

  1. ENGINE RPM2,000 RPM / APPROX. 2 MIN
  2. ENGINE RPM2,500 RPM / UNTIL WARM
  3. COOLANT TEMPERATURE65–80°C
  4. ENGINE INSTRUMENTSNORMAL
  5. ENGINE OPERATIONSMOOTH / NO ABNORMAL VIBRATION

ENGINE WARM-UP CHECKLIST COMPLETED

UNCONTROLLED WHEN PRINTED
CREATED: PRINTED:
2 / 6
NORTHERN AVIATION ASSOC, THCHIANG MAI AIRSPORT AIRFIELD
AIRCRAFT: QUICKSILVER MX IIENGINE: ROTAX 582 UL

STATUS: DRAFT — PENDING AIRCRAFT-SPECIFIC VERIFICATION

04 — BEFORE TAXI CHECKLIST

  1. WEATHER / AIRPORT DATAOBTAIN
  2. FLIGHT INSTRUMENTSCHECK / SET
  3. AVIONICS (COM / GPS)SET / CHECK
  4. ENGINE TEMPERATURECHECK
  5. FUEL QUANTITYCHECK
  6. DEPARTURE BRIEFINGPERFORM
  7. CHOCKSREMOVE
  8. TAXI AREACLEAR

IF AN ENGINE RUN-UP IS TO BE PERFORMED AT THE PARKING BAY, FOLLOW THE APPROVED ENGINE RUN-UP PROCEDURE. OTHERWISE, PERFORM IT AT THE DESIGNATED RUN-UP AREA.

BEFORE TAXI CHECKLIST COMPLETED

05 — ENGINE RUN-UP CHECKLIST

  1. AIRCRAFT POSITIONINTO WIND
  2. BRAKES / AIRCRAFT RESTRAINTSECURE
  3. ENGINE TEMPERATURECHECK
  4. ENGINE RPM3,000 RPM
  5. MAGNETO LEFTCHECK
  6. RPM DROPMAX 300 RPM
  7. MAGNETO RIGHTCHECK
  8. RPM DROPMAX 300 RPM
  9. MAGNETOSBOTH ON
  10. ENGINE RESPONSECHECK
  11. ENGINE INSTRUMENTSNORMAL
  12. THROTTLEIDLE CHECK

ENGINE RUN-UP CHECKLIST COMPLETED

MAGNETO CHECK: 3,000 RPM / MAXIMUM RPM DROP 300 RPM. OTHER RUN-UP RPM VALUES MUST BE VERIFIED AGAINST THE APPROVED PROCEDURE.

UNCONTROLLED WHEN PRINTED
CREATED: PRINTED:
3 / 6
NORTHERN AVIATION ASSOC, THCHIANG MAI AIRSPORT AIRFIELD
AIRCRAFT: QUICKSILVER MX IIENGINE: ROTAX 582 UL

STATUS: DRAFT — PENDING AIRCRAFT-SPECIFIC VERIFICATION

06 — TAXI CHECKLIST

  1. RADIO / TAXI ANNOUNCEMENTPERFORM
  2. BRAKESCHECK
  3. STEERING / TAXI CONTROLCHECK

TAXI CHECKLIST COMPLETED

07 — BEFORE TAKEOFF CHECKLIST

  1. FLIGHT CONTROLSFREE & CORRECT
  2. SEAT BELTS / HELMETSECURE
  3. FUEL VALVES / FUEL PUMPTAKEOFF CONFIGURATION
  4. MAGNETOSBOTH ON
  5. TRIM TABTAKEOFF SET
  6. ENGINE INSTRUMENTSNORMAL
  7. RUNWAY / TRAFFICCLEAR
  8. RADIO / CLEARANCEAS REQUIRED

BEFORE TAKEOFF CHECKLIST COMPLETED

08 — TAKEOFF CHECKLIST

  1. RUNWAY ALIGNMENTCHECK
  2. TAKEOFF POWER / RPMCHECK / SET

TAKEOFF CALLOUTS

  1. POWER SET
  2. AIRSPEED ALIVE
  3. ROTATE
  4. POSITIVE CLIMB

TAKEOFF CHECKLIST COMPLETED

UNCONTROLLED WHEN PRINTED
CREATED: PRINTED:
4 / 6
NORTHERN AVIATION ASSOC, THCHIANG MAI AIRSPORT AIRFIELD
AIRCRAFT: QUICKSILVER MX IIENGINE: ROTAX 582 UL

STATUS: DRAFT — PENDING AIRCRAFT-SPECIFIC VERIFICATION

09 — CLIMB CHECKLIST

PROPOSED ALTITUDE (AGL) / RPM PROFILE

ALTITUDE (AGL)ENGINE RPM
TAKEOFFFULL POWER
100 FT5,500 RPM
200 FT5,000 RPM
300 FT4,500 RPM
400 FT4,000 RPM

IMPORTANT — NOT YET VERIFIED FOR FLIGHT USE: ขั้นตอน Climb และค่า RPM ในตารางยังไม่ได้รับการยืนยัน ต้องตรวจสอบกับคู่มือของเครื่องบินลำนี้และผู้สอนก่อนใช้งาน โดยเฉพาะการลดกำลังเครื่องขณะไต่ระดับ ซึ่งอาจทำให้สมรรถนะการไต่ระดับลดลง ความสูงในตารางเป็น AGL (เหนือระดับพื้นดิน)

10 — CRUISE CHECKLIST

  1. CRUISE ALTITUDEMAINTAIN
  2. AIRSPEEDCHECK
  3. ENGINE RPMSET / VERIFY
  4. ENGINE TEMPERATUREMONITOR
  5. FUEL QUANTITYCHECK
  6. WEATHER / TRAFFICMONITOR

CRUISE CHECKLIST COMPLETED

CRUISE AIRSPEED AND RPM REQUIRE AIRCRAFT-SPECIFIC VERIFICATION.

UNCONTROLLED WHEN PRINTED
CREATED: PRINTED:
5 / 6
NORTHERN AVIATION ASSOC, THCHIANG MAI AIRSPORT AIRFIELD
AIRCRAFT: QUICKSILVER MX IIENGINE: ROTAX 582 UL

STATUS: DRAFT — PENDING AIRCRAFT-SPECIFIC VERIFICATION

11 — BEFORE LANDING CHECKLIST

  1. WEATHER / WIND DIRECTIONCHECK
  2. RUNWAY / LANDING AREACONFIRM
  3. FUEL QUANTITY / VALVESCHECK
  4. ENGINE INSTRUMENTSCHECK
  5. SEAT BELTS / HELMETSECURE
  6. APPROACH AIRSPEEDVERIFY
  7. ENGINE POWERAS REQUIRED
  8. LANDING AREA / TRAFFICCLEAR
  9. RADIO CALLPERFORM

BEFORE LANDING CHECKLIST COMPLETED

APPROACH SPEED AND POWER SETTINGS REQUIRE VERIFICATION. THE PREVIOUSLY PROVIDED 40 KIAS / 4,000 RPM VALUES ARE NOT YET APPROVED FOR THIS AIRCRAFT.

12 — AFTER LANDING CHECKLIST

  1. RUNWAYVACATE
  2. RADIO CALLAS REQUIRED
  1. ENGINE TEMPERATUREMONITOR
  2. LANDING LIGHTS — IF INSTALLEDAS REQUIRED
  3. TAXI ROUTECONFIRM

AFTER LANDING CHECKLIST COMPLETED

13 — ENGINE SHUTDOWN CHECKLIST

  1. PARKING POSITIONCONFIRM
  2. ENGINE COOL-DOWNPER ROTAX PROCEDURE
  3. ENGINESHUT DOWN
  4. IGNITION SWITCHESOFF
  5. FUEL VALVESAS REQUIRED
  6. MASTER POWEROFF
  7. RADIO / AVIONICSOFF
  8. AIRCRAFTSECURE

ENGINE SHUTDOWN CHECKLIST COMPLETED